Annunciation Greek Orthodox Cathedral

Fabrication & Installation Control

Client: MAREK, Radius Track*

We provided constructability design-assist for a multilayer dome with apertures, designed for ground-built assembly. We helped deliver the new layered structural system supporting exterior and interior curved framing, transepts, groin vaults, and barrel vaults. We produced fabrication-ready models, field installation layout information, and kitted material sequencing for efficient assembly logistics and crane hoisting.

Architect: Estudio Architecture
General Contractor: Satterfield and Pontikes
Drywall Installer: MAREK
Framing Design & Manufacturer: Radius Track

*Work performed while employed by

Services Provided:

  • Constructability Consulting

  • Prefabrication Strategy

  • Installation Strategy

  • Fabrication Drawing Automation & Generation

  • Full-Scale Templates & Guides

  • Layout & Install Validation Points

  • Installation Support

Video by MAREK

Previous
Previous

CSUS Planetarium Dome